Wesley Terrill
[BROKEN LINK: EF4E366F-A2FC-4AE2-BCE5-F0298DD5323E] Wesley Terrill Thesis [BROKEN LINK: 3E0CAFBA-6888-44EE-BD22-4D208B2ECDC5] Wesley Terrill Annual Review 2024 WesleyTerrillLetterSpring25
Wes' FNAL Talk Wes Thesis Defense Paragraph for Wes WesleyTerrillLetterSpring22
SOS
[ ]Approval Talk
Other
[ ]Thesis date
Giving approval talk for SoS
HGC
Future
- 5/29/24 not sure about postdoc or industry
- 7/23/24 thinking about postdoc
Weekly Meetings
25 August 2025 Monday
https://cmu.zoom.us/j/4126571061
- Moved to Chicago
- Wife interviewing for nursing positions
- HGCAL with Zotan, Aiden
- Analysis David Yu
- HGC Paper: Working through comments.
- SoS Paper: Stats stuff… Looking at speeding it up
- Probably last meeting with him as my student !
25 July 2025 Friday
- Start on the 8th
- WIll be based at FNAL with David Yu
- Probably Cassette Assembly.
- $60k
- HGCAL paper
18 March 2025 Tuesday
- Gave practice talk for approval
- Chat re:money plot… He should make before/after version for FNAL talk
- Wesley Terrill Thesis
- Find rules for showing public results in job talks:
- https://twiki.cern.ch/twiki/bin/view/CMS/PhysicsApprovals#Exceptions_to_standard_approval
- https://twiki.cern.ch/twiki/bin/viewauth/CMS/CMSPubComm
11 March 2025 Tuesday (Virtual)
- SOS: We are pushing to freeze the documentation for approval but with only Higgsino and one of the TChiWZ scenarios (mN2*mN1<0). I found an empty background bin for the other TChiWZ scenario and the limits are being rerun with the negative scenario binning. The documentation has all been updated and a message sent to the conveners and ARC.
- HGCAL: I am waiting on comments from people on the paper draft. We finally heard back about the cooling unit and it doesn't seem likely that it will be repaired before I leave. Otherwise, I created directions and tried them out on someone else for the measurement system so new measurements can be taken after I am gone.
- Fermilab: I have a draft of the research seminar slides (missing a few plots that I was waiting on for results and interpretations as they are rapidly being updated). I am still working on the outreach talk (10min "outreach talk should not mimic a talk you would give in a public outreach event; instead, it is an opportunity for you to describe your outreach experiences, your outreach philosophy, and your ideas on how you might perform outreach as a Lederman Fellow." ).
- Defense: I would like to send out a poll for a date in April.
4 March 2025 Tuesday
- Run-3 low-pt electron Training : see difference wrt Run-2
- Setback on the limits: bug
- 3hr for single mass point!
- Debugging ROOT plots
- HGCAL paper: implemented systematics
- Lina Diehl (CERN Fellow filling in for Eva)
- Pedro Silva
- Training and onboarding for Si-Lab
- Chatting re:preparing seminar slides
25 February 2025 Tuesday
- Back March 26th,
- Fermilab Meeting: April 2
- Applied to Cornell / Also will to TTU and Irvine
- SoS: smoothing the limits
- HGCal week: no major comments
[BROKEN LINK: 70989FA1-6823-4C54-8292-6C1ACE84162A]
- Chat re:HGC at CMU
- Working on the HGC paper
- Ava had twins !
- Chatted to Cornell prof:
- Chatted re:Muon fakes looks like a problem at low ΔR
11 February 2025 Tuesday
- Submitted application.
- HGCAL: Marchello and Eva. Updating the paper aim 2 weeks.
- Wes will present summary of studies at HGCAL week
- SoS: fits are still running. Should try removing systematics
- Told him to think more about what analysis he would do for other applications
5 February 2025 Wednesday
- Visited P5
28 January 2025 Tuesday
- Chat with Zoltan:
- Due Feb 6th
- Review statement
- SoS : peter rederived binning
- Thesis defense in mid-April
- Comments on Wes' Postdoc Application
21 January 2025 Tuesday
- Cooling unit down, looking into renting some
- Application materials
- SoS:
14 January 2025 Tuesday
- Slow start with HGC
- SoS
Thesis
- Herwig out at CERN
- Slides for Annual Review
- EXO workshop in London
- EXO Meeting Talk
- Peter on Friday
- EXO Meeting Talk
- Review annual review slides
- Send mono-jet event display
- Long chat with Wes about preparing his slides for the Annual Review
26 November 2024 Tuesday
- SUSY-SOS Analysis:
- I was able to produce some preliminary fits with the full reweighting procedure (BR + mll). I am waiting on a few fits that I resubmitted to htcondor. But the limits look pretty good (except where any mass points are missing).
- We wanted to give an update presentation to the conveners on all material answering the last questions and the J/psi reweighting but it has been pushed back to next week because of some conflict on their end. Hopefully some approval on the J/psi veto will be given such that the final binning can be derived for everything (including the mll reweighting).
- HGCAL:
- I performed a few injection scans at different temperatures on a non-irradiated HD module. I noticed a small dependence on the temperature for the ADC to fC conversion but I am still looking into how large of an effect this will have on the CCE measurements. Maybe applying uncertainties is enough to cover the dependence.
- I also noticed during these scans, some issues with the calibrations in some channels that are not consistent between measurements (spikes in the conversion factor). Other than these few channels (<10 channels), the conversion factor looks relatively stable (the same) across all channels on the module.
- Exo Workshop Talk:
- I met with the analyzers of EXO-24-017 (the boosted ditau search) and discussed their analysis in a bit more detail with them. Although they could not say what the run3 plans are for their search other than that someone will likely perform it. They also pointed me to more presentations on the topic than the conveners were able to send.
Annual Review:
- I am almost finished with an initial draft that I can send you.
- Set date for Dec 10th (9-10a EST)
Thesis:
- I am also done writing the first full draft of the document. I currently have some placeholder figures for things like CR/SR plots where I would like to eventually replace them with the final post-fit versions. Similar status for the interpretations as well.
19 November 2024 Tuesday
SoS
- reweighting.
- ARC questions answered
- Updating AN and Thesis
Dark Photon
- EXO workshop
- Annual Review
12 November 2024 Tuesday
- on shift
- working on thesis
- working on branching ration weights
- SOS approval: have CCLE / Jpsi veto
5 November 2024 Tuesday
- Sos question on what to do with the Jphi
- Si more power outlets
- 1060 nm
- hc - 1240 evnm / 1060 nm
29 October 2024 Tuesday
- Sos
- Excess only in displaced muons thought to be from J/Psi
- Will give a talk at the EXO talk
- Thesis Committee
- Will ask Eva, needs to do it still.
15 October 2024 Tuesday
HGC Paper
- VCI 2025: Vienna Conference on Instrumentation, 17-21 Feb 2025, Vienna (Austria) SoS
- problem with parametric binning.
- Plan: rederiving the parametric binning
- Low mass di-electrons
- ISR uncertainty Thesis
- Progress on thesis
- Annual review
8 October 2024 Tuesday
- HGC Paper
- Scope: IV / noise / light injection irradiated models HD - full and LD partial
- Working on the HGC paper
- check the gain of the chips
- try charge injection scan
- SoS
- slides on the different decorelation schemes
- post-fit vs pre-fit
- Peter look into binning
- Low pt electron meeting
- Discussed Noamis slides
- ID variables to retune
- Thesis
- some work on paper
- committee
1 October 2024 Tuesday
SOS
- electron fits now understood.
- Muons
24 September 2024 Tuesday
- Sos
- Fits/Debugging . Will add epsilon numbers
- Looks like problem is solved by adding an epsilon
- HGC
- slow with upgrade week
- Thesis
- Last person and set a date.
17 September 2024 Tuesday
- Confusing why we are seeing 4 sigma observed significance
- EXO meeting:
- chat re: low pt electron searches
- SOS
- Updated limits.
- Observed significant is inconsistent with limit plots and with post-fit data distributions.
10 September 2024 Tuesday
SOS
- Plots with decorrelated muon SF
- Confusing why we are seeing 4 sigma observed significance
3 September 2024 Tuesday
- HGC
- power outage caused problems in the LAB
- Lots of time, but no major damage
- Testing last irradiate partial
- power outage caused problems in the LAB
- SOS
- Fighting with permission
- Excess in data in displace muons
- Displaced electrons looks good.
- Splitting muons fakerate NP separately for high and low mass
27 August 2024 Tuesday
- HGC
- Measurements of irradiated LD partials… so far OK
- Cleaning analysis code
- Drafting paper
- Edit school ?
- SOS
- Combine tool
- Thesis
- Coming along
14 August 2024 Wednesday
- HGC
- Lots of work in the lab this week.
- SOS
- Issues getting cards for combine going.
- Porting code to python3 RDF
- Thesis
- Some progress.
6 August 2024 Tuesday
- Back from grandmothers funeral
- Took some shifts
- Started thesis drafting
- HGC
- Started outline for paper on HGC light injection and noise measurements
- SOS
- Understand combine tool
- Thesis
- Started thesis drafting
23 July 2024 Tuesday
- Long time no speak.
- SOS
- ARC review / Approval process
- Migrating to new framework
- HGC
- presented 1st results on laser measurements (went well)
- Working on more laser tests
- Thesis
- Aim Thesis Spring 25
- sent him my thesis as an example